Bathroom plumbing only
remove old suite and dispose
fit new bath ,turn around
bath panel,needs to be cut.
fit overbath screen
remove existing electric shower and refit after tiling
cc wc
wh basin
altering pipes etc
remove old rad and fit towel rad with chrome pipes.
Labour and materials only.remove plumbing rubbish and dispose
just interested.
remove old suite and dispose
fit new bath ,turn around
bath panel,needs to be cut.
fit overbath screen
remove existing electric shower and refit after tiling
cc wc
wh basin
altering pipes etc
remove old rad and fit towel rad with chrome pipes.
Labour and materials only.remove plumbing rubbish and dispose
just interested.