Hi- I'm burying a through-run of about 2m of a rings main in a concrete slab before Jabfloor insulating the floor and screeding over. (Basically I think it will be easier than chanelling out the underside of the Jabfloor for it, on top of concrete slab).
Is something like plastic flexible 15mm conduit OK for this? Or is say 22mm easier/ better.....OK?
Any help gratefully received. Thanks!
Is something like plastic flexible 15mm conduit OK for this? Or is say 22mm easier/ better.....OK?
Any help gratefully received. Thanks!