My bath and shower are totally level, so im wondering if i should start with a tile of the tub/shower i was thinking with a 5mm spacer?
or batton it off and put 3/4 of a tile down to the tub/tray?
Should you always tile off the batton, then finish down to the tub when dry? im only using 3 or 2 and 3/4 tiles in height around the tub?
Will be a lot more around 2m in the shower cubicle.
Andy
or batton it off and put 3/4 of a tile down to the tub/tray?
Should you always tile off the batton, then finish down to the tub when dry? im only using 3 or 2 and 3/4 tiles in height around the tub?
Will be a lot more around 2m in the shower cubicle.
Andy