My old heating system (Concord WRS boiler) needs updating to S plan. At present, the 2 port valve only controls the heating. If a new 2 port valve was added where shown, would this be the right place?
I think I need a bypass, is between the cylinder primaries the right place?
In the system's current layout, if just the boiler was replaced (no other changes), would it conform to regs?
(NB Feed and vent pipes not shown, they are above the boiler)
I think I need a bypass, is between the cylinder primaries the right place?
In the system's current layout, if just the boiler was replaced (no other changes), would it conform to regs?
(NB Feed and vent pipes not shown, they are above the boiler)