We are installing a new c/h and h/w system into our house and the Megaflo (indirect) and water side is now ready. The boiler has not yet been installed but we need hot water as we are moving in today.
Having taken the cover off the control housing I can see the connections for the safety cut-outs but not where to connect the immersion. Diagram 8 of the install instructions shows terminals on the back of the stat...I don't see them on mine, although I do see 2 smaller black wires coming from that area. Are they pre-wired in to the controls?
Having taken the cover off the control housing I can see the connections for the safety cut-outs but not where to connect the immersion. Diagram 8 of the install instructions shows terminals on the back of the stat...I don't see them on mine, although I do see 2 smaller black wires coming from that area. Are they pre-wired in to the controls?