Hello guys and girls
I have a 38CDI Combi and have just installed wet Uponor 20mm ufh in my conservatory, 4 loops all around 45M to a Uponor V5 compact manifold system.
I am also installing a Drayton Wiser system to rest of house radiators. (9 radiators).
I have run a couple of 1mm 2 core T&E to a position under the stairs (where the wiser main unit will sit). The Wiser system needs very little power to run.
My question is however will the Ns/Ls/Lr of the Combi also have enough power to power the V5 manifold system as I’m sure I need to run the system from the boiler feed not a seperate mains feed.
I was hoping to daisy chain from the Wiser system straight to the V5 ufh system paralleling the feed and the switched return...
Thanks in advance
I have a 38CDI Combi and have just installed wet Uponor 20mm ufh in my conservatory, 4 loops all around 45M to a Uponor V5 compact manifold system.
I am also installing a Drayton Wiser system to rest of house radiators. (9 radiators).
I have run a couple of 1mm 2 core T&E to a position under the stairs (where the wiser main unit will sit). The Wiser system needs very little power to run.
My question is however will the Ns/Ls/Lr of the Combi also have enough power to power the V5 manifold system as I’m sure I need to run the system from the boiler feed not a seperate mains feed.
I was hoping to daisy chain from the Wiser system straight to the V5 ufh system paralleling the feed and the switched return...
Thanks in advance