Wunda Rapid Response in new kitchen

Joined
22 Oct 2015
Messages
102
Reaction score
6
Country
United Kingdom
Hey there

We're mid way through finishing up the mess that our builders left us with for our extension.

I'm currently considering installing a Wunda Rapid response 20mm wet ufh system instead of rads.

One potential challenge is that ideally I need to get the kitchen fitted ASAP, as it's sat in storage unit currently.

So would it make sense to pack the cabinet legs by 25mm to allow for the 20mm overlay boards and 5 mm self-levelling.
Would then install the wunda system and self-level upto the kitchen legs before fitting the glue-down lvt and plinth.

Any potential issues with this?

Thanks
Gavin
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top