Dear doitall and Whitespirit66,
Tks very much for your help. I now understand your removal of pipe ‘A’ (as sent by email by doitall and as shown on diynot by Whitespirit66’s diag).
Can I just be doubly sure on this:
It might be ‘relatively easier’ than I originally thought to do my solution 4 i.e. have separate runs to towel rail and WC rad. Would this be preferable to first attempting ‘B’ as on Whitespirit66’s diag before then doing ‘A’. ‘B’ is ‘easy’ but once we get to ‘A’ I’m not certain as yet if that is more difficult/troublesome to my solution 4?
My gut reaction is to try ‘B’ and turn lock shield down on WC rad and if that doesn’t solve overall problem re-visit the easiness of the other two – does that sound like a plan to you two?
Many thanks for your patience and guidance,
Stuart
Tks very much for your help. I now understand your removal of pipe ‘A’ (as sent by email by doitall and as shown on diynot by Whitespirit66’s diag).
Can I just be doubly sure on this:
It might be ‘relatively easier’ than I originally thought to do my solution 4 i.e. have separate runs to towel rail and WC rad. Would this be preferable to first attempting ‘B’ as on Whitespirit66’s diag before then doing ‘A’. ‘B’ is ‘easy’ but once we get to ‘A’ I’m not certain as yet if that is more difficult/troublesome to my solution 4?
My gut reaction is to try ‘B’ and turn lock shield down on WC rad and if that doesn’t solve overall problem re-visit the easiness of the other two – does that sound like a plan to you two?
Many thanks for your patience and guidance,
Stuart