- Joined
- 7 Feb 2024
- Messages
- 26
- Reaction score
- 0
- Country
Hi,
I'm planning on replacing my lead water mains for MDPE. My water authority says I have to dig down to a min of 750mm, this sounds quite deep to me and I'm trying to get some idea of what I'll find at that depth considering my house is solid brick, 1930's....is this likely to take me under the bricks or should I have a core bit ready to go through the wall ( I imagine removing bricks in a small trench will be impractical ) ? I was under the impression that houses of this era only had very shallow foundations and I'm trying
I'm planning on replacing my lead water mains for MDPE. My water authority says I have to dig down to a min of 750mm, this sounds quite deep to me and I'm trying to get some idea of what I'll find at that depth considering my house is solid brick, 1930's....is this likely to take me under the bricks or should I have a core bit ready to go through the wall ( I imagine removing bricks in a small trench will be impractical ) ? I was under the impression that houses of this era only had very shallow foundations and I'm trying