foundations extension - join 1m deep to existing older shallow.

Sponsored Links
You only leave a splice joint unpainted if it is a HSFG connection, surely...
Exactly. Mebbe all the previous ones hadn't been designed with HSFG bolts, but the one I designed (for about 10 locations) and inspected was...
 
How can engineers spec. things so differently?! We are having to do the opposite.... M8 steel bars inserted into existing foundations with resin, to prevent them moving independently of the new ones! (We aren't going deeper than the existing though)
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top