2 lights in same junction box

If, as you say, it is only a small portion of the circuit that current doesn't have a CPC, why is it such a large problem to replace the affected wiring?

It's the lights on the stairs/ front bedroom unfortunately, so basically need to go all the way back to the CU.
You'd only need to go all the way back to the CU if none of the circuit has an earth, surely?

If most of it does then it must start at the CU and carry on for most of the way.....
 
Sponsored Links
If, as you say, it is only a small portion of the circuit that current doesn't have a CPC, why is it such a large problem to replace the affected wiring?

It's the lights on the stairs/ front bedroom unfortunately, so basically need to go all the way back to the CU.
You'd only need to go all the way back to the CU if none of the circuit has an earth, surely?

If most of it does then it must start at the CU and carry on for most of the way.....

It's over half the circuit, and basically, it'll end up being the better part of 30ft worth of plastering based on the way the cables are routed, and a lot of that on the roof of the stairs.
Some of the cable routing in this house is a little odd; the front and back of the hose are wired on separate circuits, and the cables don't necssarily go where you'd expect- There was an extension added in the 1970s, and I think various bits got done then, followed by more changes in 1995 when the current CU was fitted.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top