Hi
I am looking to remove the 2 port valve ( Danfoss ) from my central heating system and need to re connect the 22mm copper pipe work either side thus closing the gap.
From what I can see from the tech specs sheet for the 2 port valve, it has an overall length of 112.5mm.
I have found a 22mm Slip Compression Repair Coupling which has an overall length of 115mm which I could use to close the gap.
As I see it the other option would be to use a standard 22mm compression coupling together with a 22mm compression slip coupling, however the length of the copper pipe required would be quite short.
What would be the best way to do this ? I plan to leave the existing 22mm olives and 22mm nuts in place.
Many thanks.
I am looking to remove the 2 port valve ( Danfoss ) from my central heating system and need to re connect the 22mm copper pipe work either side thus closing the gap.
From what I can see from the tech specs sheet for the 2 port valve, it has an overall length of 112.5mm.
I have found a 22mm Slip Compression Repair Coupling which has an overall length of 115mm which I could use to close the gap.
As I see it the other option would be to use a standard 22mm compression coupling together with a 22mm compression slip coupling, however the length of the copper pipe required would be quite short.
What would be the best way to do this ? I plan to leave the existing 22mm olives and 22mm nuts in place.
Many thanks.