Just re-looked over the quote, it was 300m of 4 inch, not 400m, so hopefully that'll just mean it needs to be 4 sections, which we have already accounted for. Weve already looked up the costs for pipe etc, the only thing we are not sure about at the moment is lifting the pipe into place. Maybe itll be cheaper to work with 3 metre flanged sections off of a scissor lift, than 6 metre sections needing specialist lifters? Any advice from people who have done this would be appreciated
I will then be looking to use a Corgi registered gas person to do the final connections to the heaters, and to purge the system and run all the checks.