sod it, I might as well keep going now I'm on a roll:
Part P is red tape in my opinion. One example: as people are no longer allowed to open their fuse boxes, they can't do things properly, so they make do. So, I want to put a 3kw immersion heater in, oh, I can't run a new circuit because I might be put in prison. I know, I'll get a 50p junction box, cut into the ring main and wire it that way. Quick. Perfect. Job done. No hefty electricians fees. Overloaded ring main. Catch my drift?
Another example: grandpa, retired electrical engineer, is no longer allowed to install a plug socket in his kitchen for his new dishwasher he just bought. So he digs out an old extention lead from the garage and runs that behind the units instead, does the job. Until the wired plug gives in, melts and causes a fire.
Part P is red tape in my opinion. One example: as people are no longer allowed to open their fuse boxes, they can't do things properly, so they make do. So, I want to put a 3kw immersion heater in, oh, I can't run a new circuit because I might be put in prison. I know, I'll get a 50p junction box, cut into the ring main and wire it that way. Quick. Perfect. Job done. No hefty electricians fees. Overloaded ring main. Catch my drift?
Another example: grandpa, retired electrical engineer, is no longer allowed to install a plug socket in his kitchen for his new dishwasher he just bought. So he digs out an old extention lead from the garage and runs that behind the units instead, does the job. Until the wired plug gives in, melts and causes a fire.