I've been asked by a friend to adjust one of his ring mains. It's an outbuilding with it's own old Wylex CU with a 30a rewireable fuse.
Currently he has 6 single sockets in one room with the ring going up into the attic supplying 6 double sockets. The attic ones are not in use and are currently just back boxes with the poles taped to one another, the wiring is old black and red standard. He wishes to supply 8 double sockets in another room and rip out the redundant ones in the attic.
My plan was to cut into the wires that supply the attic, use junction boxes to extend them into the new location and ring the new 8 doubles. I also plan on replacing the 30amp rewireable fuse with a new 32a type B MCB.
Is this a sound plan? I'm confident it will work; I'm just looking for a bit of input and error checking really.
I'd (personally) also like to have the ablity to isolate the new 8 doubles with a single switch. I believe I can't do this if I plan to use the ring route?
Currently he has 6 single sockets in one room with the ring going up into the attic supplying 6 double sockets. The attic ones are not in use and are currently just back boxes with the poles taped to one another, the wiring is old black and red standard. He wishes to supply 8 double sockets in another room and rip out the redundant ones in the attic.
My plan was to cut into the wires that supply the attic, use junction boxes to extend them into the new location and ring the new 8 doubles. I also plan on replacing the 30amp rewireable fuse with a new 32a type B MCB.
Is this a sound plan? I'm confident it will work; I'm just looking for a bit of input and error checking really.
I'd (personally) also like to have the ablity to isolate the new 8 doubles with a single switch. I believe I can't do this if I plan to use the ring route?