Soil and vent pipe [SVP] should be at least 100mmØ throughout its length and to the birdcage on top to the best of my knowledge.
Its not common to mess about with vent pipes these days since the introduction of self resealing and anti vac traps.
You may need to get your terminology right. I suggest you read The Building Regs thoroughly.
If anyone shows me an official document where it says you can reduce an SVP to 50mmØ then I will believe it can legally be done.
My advice is to use 1 complete stack and durgo valves on the other two.