Counting from the left. the filling loop will be between pipe 4 and pipe 5.
As you have been told it should be a flexible silver pipe but the general standard of the pipework would imply that its probably NOT going to look like that and could take any form at all but will have a tap or valve or possible two.
The trick is to find something between those two pipes!
Tony
As you have been told it should be a flexible silver pipe but the general standard of the pipework would imply that its probably NOT going to look like that and could take any form at all but will have a tap or valve or possible two.
The trick is to find something between those two pipes!
Tony