- Joined
- 15 May 2023
- Messages
- 43
- Reaction score
- 0
- Country
I need to connect a steel post to a steel already in place. SE has specified 4 m16 bolts for the connection. That in itself is fine, I would just drill the steel and bolt up, but the steel has already been packed with timber - just to sense check myself, should i be notching out this timber for the bolt/ nut, or is there a better way?
Similarly, i'll need to put a wall plate on top of the steel - what's the best way of attaching this? I feel like notching out loads of pockets for bolts isn't great, as the floor below is hung on this packed timber.
Similarly, i'll need to put a wall plate on top of the steel - what's the best way of attaching this? I feel like notching out loads of pockets for bolts isn't great, as the floor below is hung on this packed timber.