S
sjwkmje
Hi,
On the subject of BIG generators you might like these generators.
Never really shown these photos before, I was employed there when these were taken and did not really want to put them on a public forum. Now I have resigned three years ago, and the electrical engineering manager has now resigned I cannot see why not
There uploaded on my gallery on my website here:
http://picasaweb.google.com/adamhorden/BackupGeneratorsWalsallHospitalsNHS
You will notice the main Merlin Gerin ACB never had a padlock this is on the output of the 2400A gen set, and the generator house was never that secure!
The first gen set covered the main parts of the hospital, all of west wing. There was then a couple more gen sets for the other wings.
I miss that job
Any questions just ask, I might start a new thread about them if there is interest.
There are some photos of the HV disp gear as well. We had our own substations on site and we could supply the grid if required. Power factor on site was unity.
Adam
On the subject of BIG generators you might like these generators.
Never really shown these photos before, I was employed there when these were taken and did not really want to put them on a public forum. Now I have resigned three years ago, and the electrical engineering manager has now resigned I cannot see why not
There uploaded on my gallery on my website here:
http://picasaweb.google.com/adamhorden/BackupGeneratorsWalsallHospitalsNHS
You will notice the main Merlin Gerin ACB never had a padlock this is on the output of the 2400A gen set, and the generator house was never that secure!
The first gen set covered the main parts of the hospital, all of west wing. There was then a couple more gen sets for the other wings.
I miss that job
Any questions just ask, I might start a new thread about them if there is interest.
There are some photos of the HV disp gear as well. We had our own substations on site and we could supply the grid if required. Power factor on site was unity.
Adam