Boarding floor on damp concrete

What is underneath the concrete?

you should allow 1 month per inch of concrete drying time. This time of year possibly more.
I'd piped for underfloor heating? If so get that connected up and running at a low temperature.
 
Sponsored Links
It's screed with membrane under, on top of insulation on top of concrete with membrane under, on top of type 1, all wacked down.
Oof, I'd have swapped that concrete out for insulation and put UFH in the screed
 
What is underneath the concrete?

you should allow 1 month per inch of concrete drying time. This time of year possibly more.
I'd piped for underfloor heating? If so get that connected up and running at a low temperature.
Hi F,
See #15
Ok.
C
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top