- Joined
- 17 Aug 2004
- Messages
- 476
- Reaction score
- 1
- Country
Hi All
I've got a boiler swap to do next week, taking out a netaheat 10-16 on an S plan system and I have a query that hopefully someone can give me a bit of advice on.
First off, I've never really had anything to do with S plan before, mostly all Y plan and combis. On initial inspection the boiler seems to have 1 flow and 2 returns which definitely won't suit the new boiler. All the pipework is conveniently located behind the HWC which will almost certainly have to come out. There is currently an ancient old danfoss programmer providing proper 2 channel control.
So, my query is this. Would I be better off converting to Y plan or can I simply tee the returns together and leave the rest as is?
Sorry if this is all obvious to some, I've tired downloading the specs for the netaheat but can't find them anywhere.
Cheers and TIA
I've got a boiler swap to do next week, taking out a netaheat 10-16 on an S plan system and I have a query that hopefully someone can give me a bit of advice on.
First off, I've never really had anything to do with S plan before, mostly all Y plan and combis. On initial inspection the boiler seems to have 1 flow and 2 returns which definitely won't suit the new boiler. All the pipework is conveniently located behind the HWC which will almost certainly have to come out. There is currently an ancient old danfoss programmer providing proper 2 channel control.
So, my query is this. Would I be better off converting to Y plan or can I simply tee the returns together and leave the rest as is?
Sorry if this is all obvious to some, I've tired downloading the specs for the netaheat but can't find them anywhere.
Cheers and TIA