Please excuse my ignorance but I have just had a EICR carried out and I have no bonding to the water, the stop tap is a long way from the DB and a nightmare to get there. The pipe coming into the house is lead so requires grounding but I have been told that I could put a length of plastic pipe after the stop tap and the copper pipe and that this might bond it but it would require checking to confirm once installed. Is it possible that this would work as it would be much less problematic than trying to get an earth to the DB but it sounds too easy of a fix?