Yes, I've had a look and around 75% of it is within 1m but I can excavate down 150mm below to prevent loading. I'm then planning to bridge the remainder. I'll get the BCO to agree to it once I get the first visit done. Wessex's document allows this as a method so I hope it won't be too hard to sort out.
Buying all those lintels is pricey and I suspect the architect was playing very cautious and I probably took my eye off the ball.