First post so hoping someone can help I need to change the diverting valve on my system but have become some what confused as to what plan my system is
I assumed it was C Plan but investigating I found that only the the live and neutral were connected as in a W Plan but if it was a W Plan it would need a 3 port valve and not a diverting valve 2 port , also if I'm correct a C Plan system would require a 4 pipes from the boiler I only have 2, can a C Plan system work with a 2 pipe boiler or is my system some sort of hybrid
Any guidance would be very much appreciated
I assumed it was C Plan but investigating I found that only the the live and neutral were connected as in a W Plan but if it was a W Plan it would need a 3 port valve and not a diverting valve 2 port , also if I'm correct a C Plan system would require a 4 pipes from the boiler I only have 2, can a C Plan system work with a 2 pipe boiler or is my system some sort of hybrid
Any guidance would be very much appreciated