This may be a silly question, but please bear with me.
As some will remember I had numerous CUs and with advice have had one replaced with a 19 way populated with RCBOs where appropriate. The intention was that it meant I can get the other CUs moved into the new 19way one by one reducing the disruption to the house, and I chose RCBOs because JohnD told me to (sorry I mean because it was the best route and with a view to ease of 17th ed compliance).
The question I have is, when I want to get the next CU transferred (which will almost certainly be after 17th ed starts) will I have lots of remedial work? For example, will I have to have lighting drops ripped out and metal conduit or some other protection included to comply? Beacause if that's the case then I will end up with a very under used new CU, and I think it will seriously put off people making their electrical installation safer. Or will it just have a massively long list of non-compliances making the installation safer, but practically unsalable?
As some will remember I had numerous CUs and with advice have had one replaced with a 19 way populated with RCBOs where appropriate. The intention was that it meant I can get the other CUs moved into the new 19way one by one reducing the disruption to the house, and I chose RCBOs because JohnD told me to (sorry I mean because it was the best route and with a view to ease of 17th ed compliance).
The question I have is, when I want to get the next CU transferred (which will almost certainly be after 17th ed starts) will I have lots of remedial work? For example, will I have to have lighting drops ripped out and metal conduit or some other protection included to comply? Beacause if that's the case then I will end up with a very under used new CU, and I think it will seriously put off people making their electrical installation safer. Or will it just have a massively long list of non-compliances making the installation safer, but practically unsalable?