Hi,
I'm a bit confused about readymix concrete. My spec says C15 concrete mix (for footings), but everyone says you can't pump a C15 mix, so I've asked them for the nearest equivalent which is pumpable and got three quotes. One readymix supplier (who was the cheapest) suggested what he called a "Gen 3" pump mix, but was unable to give me the ratio that would be used for that, but said it was about equivalent to a C20, therefore over spec.
So I now rang the pumping guy, to confirm with him. He talked very scathingly about the 'Gen 3" specification and said it was rubbish. He told me to make sure I got 300Kg cement per metre cubed for the pump.
Now I'm concerned about the reliability of the suppliers and that the quotes might not be comparing like-for-like. Please let me know the best way of specifying a pump mix so I can get the right thing. Not having much experience I won't know if they've got it wrong come delivery time.
many thanks.
I'm a bit confused about readymix concrete. My spec says C15 concrete mix (for footings), but everyone says you can't pump a C15 mix, so I've asked them for the nearest equivalent which is pumpable and got three quotes. One readymix supplier (who was the cheapest) suggested what he called a "Gen 3" pump mix, but was unable to give me the ratio that would be used for that, but said it was about equivalent to a C20, therefore over spec.
So I now rang the pumping guy, to confirm with him. He talked very scathingly about the 'Gen 3" specification and said it was rubbish. He told me to make sure I got 300Kg cement per metre cubed for the pump.
Now I'm concerned about the reliability of the suppliers and that the quotes might not be comparing like-for-like. Please let me know the best way of specifying a pump mix so I can get the right thing. Not having much experience I won't know if they've got it wrong come delivery time.
many thanks.