"you've got to shift it all by hand"
We've moved on from "hand" work.
We use a 22 ton Daewoo and 17 ton Komatsu. Both capable of lifting a cubic meter in Secatol skips or their buckets.
Hiring a pump is rare for the operation we run. Would put your lights out overnight. The big Daewoo will lift 150 cube into peri formwork before this weeks out.
We've moved on from "hand" work.
We use a 22 ton Daewoo and 17 ton Komatsu. Both capable of lifting a cubic meter in Secatol skips or their buckets.
Hiring a pump is rare for the operation we run. Would put your lights out overnight. The big Daewoo will lift 150 cube into peri formwork before this weeks out.