Hi, I saw someone on this board mentioning that he capped a live service line using the Philmac UTC.
I was wondering if it's really possible to do this on a p, particularly in my situation. I have a 1" lead supply line that's leaking and it there is no shutoff valve between the water main and the leak. Is there any hope of putting a Philmac Universal joiner on it connected to a stop valve while the water is still running? All the plumbers I talked to said they think the water flow would be too strong to put a fitting in. The only think they'll consider is digging up the entire service line all the way to the street main, which will be exceedingly expensive. The line can't be frozen and it can't be shut off without excavation. Any thoughts? Thanks!
I was wondering if it's really possible to do this on a p, particularly in my situation. I have a 1" lead supply line that's leaking and it there is no shutoff valve between the water main and the leak. Is there any hope of putting a Philmac Universal joiner on it connected to a stop valve while the water is still running? All the plumbers I talked to said they think the water flow would be too strong to put a fitting in. The only think they'll consider is digging up the entire service line all the way to the street main, which will be exceedingly expensive. The line can't be frozen and it can't be shut off without excavation. Any thoughts? Thanks!
Last edited: