I stand corrected
9. Work started on the construction of a building on the tennis court on 1 December 2021 and in January 2022 the matter was brought to the attention of the Council. The building under construction was not in accordance with the November 2021 planning permission in that it was being built closer to the Woburn Road properties and it included an additional wing.
10. In March 2022 a retrospective application was submitted by Maytrix Group Ltd to retain the building as built, amounting to approximately 208sqm. The application covering letter described the proposed use as being “for purposes incidental to the existing dwelling including private domestic use, interviews and charity functions. You will note that a spa pool pit has been incorporated in the additional wing to accommodate the prefabricated spa pool”. The accompanying revised DAHS stated the use would be for uses incidental to the enjoyment of the dwelling. This application was refused in November 2022.
Plans are here
This page shows publically available documents from our casework system
cbc.aifusion.io