Is cement-stabilised soil an adequate sub-base for a patio? I'm thinking of digging the soil (quite heavy clay) to a depth of 100mm, thoroughly mixing with 20mm cement, compacting & watering. This would then have the bedding layer directly on top and then the paving slabs.