Hi
Question is about mortar mix, I need to fill a gap of about 250mm above a steel beam.
Its not load bearing/structural just decorative so when cementing on top of steel anything beside 3/1 mix I should be doing.
I have done minor jobs to brick/stone before but never steel - cant get in my head how metal and cement bond, I am probably over thinking this.