Changing fuse for new consumer unit

I’m gonna get him to install a new consumer unit. Is it a fairly simple affair to swap for a sparky? Connecting existing circuits to the new board?

If he offers to fit the CU and test afterwards he is a crook, and you could be exposed to uncontrollable additional costs.

The testing of your existing circuits must be carried out first because existing faults could be found that would make the new CU inoperable. The faults must be rectified before the new CU is installed.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top