I'm about to gut 46 sq. mts of basement and then tank it. After that I want to install wet underfloor heating but the contractor's idea of how to do the build-up for the UFH does not seem sensible. So far he has been v. helpful, but advice/guidance from a wiser head that would get us both on the same page would really helpful. This is his approach:
1. Lay DPM (reaching up 1.2 meters on all the walls).
2. Lay 100mm thick insulation (Kingspan or Celotex).
3. Lay 150mm concrete slab.
4. Lay 45 x 45 battens on the slab (centres not fixed yet).
5. Lay UFH pipework between battens.
6. Lay 18mm chipboard flooring.
7. Lay 20mm engineered wood floor onto the chipboard.
What I don't get is 1) Why would he put the insulation under the concrete. If there is a concrete slab under the water pipes surely heat will be lost downwards through the concrete? 2) From my perspective 18mm of chipboard between the pipework and the 20mm engineered floor is a NO because of its poor thermal conductivity. I see the chipboard as a barrier to heat transmisssion This is my version of the build-up:
1. Lay DPM etc.
2. Lay 150mm concrete slab on the DPM.
3. Lay 75mm insulation (Kingspan or Celotex) on the slab.
4. Lay vapour barrier layer (Visqueen)
5. Lay pipework - pinned to insulation.
6. Lay screed.
7. Lay engineered wood floor.
Thanks in advance for advice on this.
1. Lay DPM (reaching up 1.2 meters on all the walls).
2. Lay 100mm thick insulation (Kingspan or Celotex).
3. Lay 150mm concrete slab.
4. Lay 45 x 45 battens on the slab (centres not fixed yet).
5. Lay UFH pipework between battens.
6. Lay 18mm chipboard flooring.
7. Lay 20mm engineered wood floor onto the chipboard.
What I don't get is 1) Why would he put the insulation under the concrete. If there is a concrete slab under the water pipes surely heat will be lost downwards through the concrete? 2) From my perspective 18mm of chipboard between the pipework and the 20mm engineered floor is a NO because of its poor thermal conductivity. I see the chipboard as a barrier to heat transmisssion This is my version of the build-up:
1. Lay DPM etc.
2. Lay 150mm concrete slab on the DPM.
3. Lay 75mm insulation (Kingspan or Celotex) on the slab.
4. Lay vapour barrier layer (Visqueen)
5. Lay pipework - pinned to insulation.
6. Lay screed.
7. Lay engineered wood floor.
Thanks in advance for advice on this.