Not sure if I have read this correctly but you want to leave an unvented void between the sheeting and the insulation? So:You should be insulating between the studwork leaving an inch gap so when you fit the membrane on the studwork you will have an inch gap behind, then fit you batons to the studwork which will give you another gap behind the cladding.
pb - stud work with insulation- void- sheeting - more insulation - membrane - batons (vented void)- cladding
This is real bad idea, you should not have any unvented voids in the building fabric especially between two layers of insulation, you will get condensation and stale air in there.