Just had an oil to gas conversion done.
I want to improve the pipe lagging here. What should I use, Armaflex?
I want to make the pipe insulation as precise as possible.
Down the line I want to replace all the loft insulation and achieve 300mm depth or equivalent - but I'm concerned the boiler pipes are in the way here. Any creative ideas on achieving the appropriate u-value for loft insulation?
Also.. am I going to need to have these notched joists reinforced?