Hi all, I'm planning to redo the condensate pipe from my boiler. The pipe is currently 22mm however I want to cut this and replace part inside and the entire outside section with 32mm to avoid the pipe freezing without the need of insulating. Is there a part I can get to make the 22-32 couple? How is this usually done?
Also is pushfit or s.weld better for the 32mm section?
Thanks.
Also is pushfit or s.weld better for the 32mm section?
Thanks.