The house we bought has an outbuilding adjoined, basically an old storage building with toilet room.
The previous owner got building regs to convert it to 'utility room with access to house'. We have since knocked a doorway through.
The outbuilding walls are single layer brick, so no cavity walls.
Do I need to get any kind of permission now before insulating (I thought probably foam backed plasterboard)?
The previous owner got building regs to convert it to 'utility room with access to house'. We have since knocked a doorway through.
The outbuilding walls are single layer brick, so no cavity walls.
Do I need to get any kind of permission now before insulating (I thought probably foam backed plasterboard)?