The builder has levelled our concrete kitchen floor. First he painted is with a bituminous waterproofing layer, then a couple of days later poured the levelling compound. the levelling compound has now cracked quite alot and lifted in places. I presume this is not normal so do I need to get him to take up the levelling compound he has poured and re-do it? or can I lay ceramic floor tiles over this?