The cable should be blinded with sand or ground with tiles on top to shield and protect it as soon as the joint has been done. It shouldn't be left exposed in a live condition.
All I know is the re-closer / breaker at the top of the pole is closed so assume it maybe live.
The photo was taken on Sunday, not had a chance to walk back up the lane yet.