I have to dig a hole for a point foundation under an existing floor in a post and beam timber framed house.

The last time this was necessary we used a hand held ( two man ) petrol driven auger 450mm diameter working from the floor down between the joists. Hired for a day this auger dug the two holes in a couple of hours.

Now we cannot find that size of auger for hire.

Hole is to be three to four foot deep. Minimum of 450mm diameter. Problem is the floor joists are 370mm above ground level so very restricted access to dig by hand. ( floor boards will be removed ).

The new foundation is due to heavy kitchen equipment arriving in 3 weeks time.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top