I don't see how manufacturers can give different figures for the necessary clearance from a 100+mm hole to the edge of a structural opening. A hole is a hole, irrespective of what make of flue you stick though it, and there can only be one valid figure for the clearance.Numpty has gave the right answer as he is the only one to put "subject to M I`s . Most say 150mm to opening in fabric but some give different distances
I think some of you (even simond!) are still confusing clearance to structural openings with clearance to ventilation openings. Vaillant MIs refer to the 150mm figure for structural openings.