Hi

What insulation did you use for the rafters.

Did you consider using quilt such as Actis Tri iso.

I have a 7x2 ridge board. I persume you had similar. How did you strengthen it without the use of steel or lossing headroom.

Did you brace each rafter at the apex just below the ridge board.

What size timber did you use for the cheek walls.

Did you put a 20mm spacer between the roof plate and new joist to avoid snagging the lime plater etc.

Thanks in advance. Simon
 
Hi

What insulation did you use for the rafters.
to the front storage area I have 100mm kingspan/celotex then silver foil

Did you consider using quilt such as Actis Tri iso.
As spec'd by building control
I have a 7x2 ridge board. I persume you had similar. How did you strengthen it without the use of steel or lossing headroom.
I think i have similar, all interlinked
Did you brace each rafter at the apex just below the ridge board.
Mine was connected front to rear on each rafter as it hung out the rear formed the flat roof joists, BR spec'd Dia 75mm timber connectors that are a bugger to get but have a load left now.
Apparently the loads all work out

What size timber did you use for the cheek walls.
I merged 2 ways.
SE had the 50x50mm and 15mm ply and a few other things no corner post, BUT BR changed it to 100x50mm and 9.5mm ply with a 100x100 corner post for insulation purposes
SE said not strong enough, so I now have 50x50 doubled up on 2 sheets of 9.5mm ply, with the corner post every one happy.
Did you put a 20mm spacer between the roof plate and new joist to avoid snagging the lime plater etc.
yes if lime plaster you will need to chicken wire in the Rockwall
Thanks in advance. Simon


My SE was great but my Draftsman was rubbish, considering he was local seemed to have limited knowledge of our local BR
 
Hi

Thanks Again.

What do you mean when you say the ridge beam was interlinked. Did they make it a Fitch Beam.

When you said you ran the dormer roof joist through. Do mean you ran it horizontally through from the dormer connecting the front rafter and the back rafter( Stub after cutting) under the ridge board. Then bolting it on using the 75mm timber connectors.

Did you beef up the front rafters.

Did you brace the front rafters back down to the binder beam or did you introduce another purlin.

The structural engineer has quoted me 480 + VAT. to strengthen the roof and design the dormer. Was this close to you.[/img]
 
Sponsored Links
Does that help nothing was done to the ridge
The dormer joist you have read a right
The front where made up to 100x50mm ish screwed and glued 50x50
Seem to recall paying a bit more but would need to look back at recept or blog I doing for family etc
 
Hi,

I came across your build and was wondering how it was progressing? I am trying to get ideas for loft conversions.

Thanks,

F
 
slowly at the moment
Money and time issues the other issues like B&Q shower install that was abit "****"
I have not done anything since july!!!!! have all bedrooms complete

To complete i need to plaster the corridors and stairs,
fit fire door in ground floor ( now frame etc there) and decorate
fit proper vent in eves ( currently not worried as you can see daylight through the gaps)
keep meaning to update this topic but bit more here
http://carters-loft.blogspot.co.uk/
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top