Trying to fit a new staircase but to obtain the necessary 2m vertical clearance the stairs need to be moved back. Only problem is a double joist (2 seperate joists) is in the way. Can I remove a section of one of the joists and tie in the cut joist to the second with a couple of bolts to ensure continued support for the ceiling?
Any advice appreciated.
thanks