- Joined
- 15 Aug 2016
- Messages
- 8
- Reaction score
- 0
- Country
I'm about to pour a slab for a 6m x 3m shed. Planning on at least a 4-6" slab (3.5m^3 - I'm buying the beers for a few mates!) as the shed will have a tiled roof & a few hefty machines, but the ground underneath is very, very solid. The shed will have a base sat upon 3" treated bearers, which I intend to wrap the underside of with DPM & leave gaps between bearers for under-base ventilation. Is it probably unnecessary to install a DPM under the slab itself before I go ahead with the pour?