- Joined
- 24 Nov 2005
- Messages
- 685
- Reaction score
- 98
- Country
1. Remove 3/4 blanking cap of flow isolation valve.What is the knack?
2. Remove M/V head and with a blunt instrument push the diverter pin down about halfway.
3. Leave the boiler drain cock open at the same time and then watch it run out of the open ended isolation valve ..Should get about half a bucket full