Hi
Despite similar posts I cant find one that informs me on my options with my problem.
I began to dig out the footings for an extension, along each wall (x3) rruns the drain. (i couldnt be worse if it was planned)_
I am unable to re route the drains on the outsiede of the extension as the proposed new bulidng line runs along the boundary line which itself is covered with a wall.
In the absense of building knowledge, hence this post, I have two options. run the drains on the inside of the building or reduce the size of the extension so that I can fit a new drain between the extension wall and the boundary line.
my preference is to run the drain inside the new builidng is this permitted?
are there any other optins?
thanks in advanace
Despite similar posts I cant find one that informs me on my options with my problem.
I began to dig out the footings for an extension, along each wall (x3) rruns the drain. (i couldnt be worse if it was planned)_
I am unable to re route the drains on the outsiede of the extension as the proposed new bulidng line runs along the boundary line which itself is covered with a wall.
In the absense of building knowledge, hence this post, I have two options. run the drains on the inside of the building or reduce the size of the extension so that I can fit a new drain between the extension wall and the boundary line.
my preference is to run the drain inside the new builidng is this permitted?
are there any other optins?
thanks in advanace