Driveway

Joined
15 Jul 2022
Messages
89
Reaction score
2
Country
United Kingdom
Hi All,
I hope you are well. I am digging in the front yard to prepare everything for the driveway.
I come across a yellow gas pipe about 35-40cm deep in relation to the public pavement.

My plan is to remove about 30cm of soil and replace it with 20cm of MOT type 3 compact it
then 5cm plastic grid to fill with gravel.

Can this gas pipe be left like that or do we have to put some bricks and cover with concrete slab then put the MOT aggregate?
Please advise.
 
Sponsored Links
For anyone who needs I got an answer at another message board:
Gas pipes need to be buried to at least 450mm under a driveway with light vehicular traffic. If you can't reach that depth then you need mechanical protection, like a concrete slab at least 100mm above the pipe. If you've got heavy vehicles, then you may need more depth, like 600mm. The pipework should be bedded in sand.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top