hi all..after made redundant just before christmas ive finally found some more work and need to ask a few questions before i start to make sure i get off on the right foot
basically i havent done emergency lighting much as im mostly a house basher but am i right in saying with emergency lighting its a normal 2core and earth to the 1st light then a 3 core from there on with connecting the extra feed together theres the emergency fitting? and how do i incoporate the emergency key switch into it?
and the boiler question ive connected up a new boiler on its own supply but only using the 3core flex to the spur to switch it on and off ive run a seperate 3 core from the spur to a stat which i havent connected up yet as i was going to replace the 3core with a 5 core the thing i have is what core do i put in ls and lr ( i think thats wat it said) any help would be appriciated..the boiler is a worcester bosch combi with a built in timer, hope this helps
basically i havent done emergency lighting much as im mostly a house basher but am i right in saying with emergency lighting its a normal 2core and earth to the 1st light then a 3 core from there on with connecting the extra feed together theres the emergency fitting? and how do i incoporate the emergency key switch into it?
and the boiler question ive connected up a new boiler on its own supply but only using the 3core flex to the spur to switch it on and off ive run a seperate 3 core from the spur to a stat which i havent connected up yet as i was going to replace the 3core with a 5 core the thing i have is what core do i put in ls and lr ( i think thats wat it said) any help would be appriciated..the boiler is a worcester bosch combi with a built in timer, hope this helps