Hi All,
I am in the process of planning a side extension to my property. Given our funds, my plan was to get the extension started with the money we have and then build in stages over the 12-18 months as funds allow.
One potential problem that I’ve identified now is that the wall onto which the new extension will be built has the flue for the boiler in it.
The boiler (Gloworm Economy Plus) is currently in corner of the existing kitchen – but the kitchen will be moved into the new extension once completed and at that point a new boiler will be installed.
However, I anticipate there may be several months between the time that the building starts and when the new extension is water-tight and the new boiler can be installed.
Therefore I am wondering about the ability to use the existing boiler while the build is going on as the flue will be sited within the build area ?
- Does the existing boiler need to be decommissioned before the build starts, or can it continued to be used until the new extension is enclosed (once the roof is on)?
- Or, could the flue be turned 90 degrees on the existing boiler and a new hole/flue installed onto the adjacent wall to the existing boiler ?
All work would be done by a gas safe plumber – at the minute I’m just trying to get my head around what can be done so that we can continue to have CH/HW once the build starts.
Many thanks
I am in the process of planning a side extension to my property. Given our funds, my plan was to get the extension started with the money we have and then build in stages over the 12-18 months as funds allow.
One potential problem that I’ve identified now is that the wall onto which the new extension will be built has the flue for the boiler in it.
The boiler (Gloworm Economy Plus) is currently in corner of the existing kitchen – but the kitchen will be moved into the new extension once completed and at that point a new boiler will be installed.
However, I anticipate there may be several months between the time that the building starts and when the new extension is water-tight and the new boiler can be installed.
Therefore I am wondering about the ability to use the existing boiler while the build is going on as the flue will be sited within the build area ?
- Does the existing boiler need to be decommissioned before the build starts, or can it continued to be used until the new extension is enclosed (once the roof is on)?
- Or, could the flue be turned 90 degrees on the existing boiler and a new hole/flue installed onto the adjacent wall to the existing boiler ?
All work would be done by a gas safe plumber – at the minute I’m just trying to get my head around what can be done so that we can continue to have CH/HW once the build starts.
Many thanks