I am making an application to have a single supply divided into two and relocate the meters in the entrance hall. I need help with filling section E as shown below.
Section E - Upgrade
Existing Power: KVA Single Phase
Required Power: KVA Single Phase (up to 23kva)
I took the following information from an electrician and may have noted it incorrectly:
Eiisting Power: 100 KVA Single Phase
Required Power: 60 Amp KVA Single Phase (up to 23kva)
Thank you in advance for your help
Section E - Upgrade
Existing Power: KVA Single Phase
Required Power: KVA Single Phase (up to 23kva)
I took the following information from an electrician and may have noted it incorrectly:
Eiisting Power: 100 KVA Single Phase
Required Power: 60 Amp KVA Single Phase (up to 23kva)
Thank you in advance for your help